Development Projects

There are many exciting projects currently proposed or underway in Burbank! Highlighted below is a list of major development projects. If you would like further information, please contact the Burbank Planning Division at 818.238.5250 or click here.

If you have inquiries regarding development opportunities, please contact us at 818.238.5180 or econdev@burbankca.gov.

Aero Crossings
2311 N. Hollywood Way
Status: Under Construction
Estimated Completion Date: TBD

862 residential units (80 low-income units, and 12 live-work spaces), 9,700-square-foot of retail space, 151,800-square-foot of office space, 1,613 parking spaces, and 91,575-square-foot of open space including paseos, courtyards, and roof decks.

First Street Village
First Street and Magnolia Boulevard
Status: Under Construction
Estimated Completion Date: Late 2024

Mixed-use project consisting of three six-story buildings with 275 multi-family apartments and 18,876-square-foot of ground retail and commercial space. The property is the first of its kind to include 14 affordable housing units.

Home 2 Suites by Hilton
129 E. Providencia Ave
Estimated Completion Date: TBD

Five-story, 43,896-square-foot hotel with 84 rooms.

ALOFT and Residence Inn Hotel
2500 N. Hollywood Way
Status: TBD

A proposed 7-story dual-brand hotel that would be operated by Aloft Hotels and Residence Inn. The hotel will consist of 420 hotel rooms – 219 hotel rooms operated by Aloft and 201 hotel rooms operated by Residence Inn.

AC Hotel
550 N. Third Street
Status: Under Review
Estimated Completion Date: TBD

Six-story 196-room hotel with a 3,800 square feet ground-level restaurant and three levels of subterranean parking. Amenities to include a fitness center, lounge, pool, outdoor courtyard, and rooftop viewing deck.

4100 W. Riverside Drive Mixed Use Project
4100 W. Riverside Drive
Status: Under Review
Estimated Completion Date: TBD

A proposed mixed-use development with a total of 72 residential units, 17,144 square feet of commercial space and 155 parking spaces.

LaTerra SELECT
777 Front St (Zero Site)
Estimated Completion Date: 2024-2025

A mixed-use project featuring 573 rental units, a 307-room 7-story hotel, and 1,067 sq. ft. of ground retail. The residential portion consists of an 8-story building with one level of underground parking.

Ranch Lot Studios
411 N. Hollywood Way
Estimated Completion Date: TBD

A 30-acre studio campus in 869,073 sq. ft. consisting of 16 sound stages and a five-story office building and parking structure.

Airport Replacement Terminal
2627 N. Hollywood Way Burbank CA 91505
Estimated Completion Date: 2026

A new 14-gate, 355,000-square-foot replacement terminal to be built with up to 6,637 parking spaces.

The Pickwick Project
921 W. Riverside Drive
Status: Under Review
Estimated Completion Date: TBD

Construction of 92 three-story residential townhomes ranging from 1,333 to 1,912 square feet on a 5.05-acre site.

Bob Hope Center
3201 W. Olive Avenue
Status: Under Review
Estimated Completion Date: TBD

The proposed project is a new mixed-use residential/commercial building that consists of 144 rental residential units (15 very-low-income units), 1,058 square feet of commercial ground-floor area, 2-levels of subterranean parking areas, and a publicly accessible open space (Bob Hope Park).

Butterfly Gardens
910 Mariposa Avenue
Status: Under Review
Estimated Completion Date: TBD

Construction of 6 3-story residential structures containing 23 townhomes, 44 enclosed parking spaces, and 2 open parking spaces.

SB 35 Projects:

2814 W. Empire Ave - This project includes the construction of a multi-family residential building with 148 units, 7 on-site parking stalls, and 18 bicycle stalls.

3000 & 3001 W. Empire Ave - Combined these projects include the construction of a multi-family residential building with 471 units, 99 parking stalls, and 52,502 square feet of open space.