Development Projects

There are many exciting projects currently proposed or underway in Burbank! Highlighted below is a list of major development projects. If you would like further information, please contact the Burbank Planning Division at 818.238.5250 or click here.

If you have inquiries regarding development opportunities, please contact us at 818.238.5180 or econdev@burbankca.gov.

Avion Burbank
3001 N Hollywood Way - Adjacent to Hollywood Burbank Airport.

Status: Under Construction

Estimated Completion Dates:
May 2021 - Creative Industrial, Creative Office and Retail Complete.
Mid 2022 - Hotel Complete.

A business park on approximately 60 acres of vacant land adjacent to the Hollywood Burbank Airport. Amenities Include 15,000 SF of Retail and a 150-Room Hotel. The City Council approved this project on April 16, 2019.

AC Hotel
550 North Third Street
Status: Under Review
Estimated Completion Date: TBD

This 196-room, 6-story hotel across the street from the newly renovated Burbank Town Center will feature a 3,800 sq. ft. restaurant space, a street level public courtyard, and rooftop observation deck.

Aero Crossing Mixed Use Project
2311 N. Hollywood Way
Status: Under Construction
Estimated Completion Date: TBD

The proposed project will encompass 862 residential units, 80 low-income units, and 12 live/work spaces. In addition to the residential units, LaTerra will include 9,700 SF of retail space, 151,800 SF of office space, 1,613 parking spaces and 91,575 SF of open space that includes paseos, courtyards and roof decks.ce.

First Street Village
First Street and Magnolia Boulevard
Status: Under Construction
Estimated Completion: 2023

A mixed residential-commercial project in Downtown Burbank at First Street between Magnolia Boulevard and the alley southeast of Palm Avenue including 275 apartments and 18,876 square-feet of retail and commercial space. The City Council approved this project June 13, 2017.

Cambria Hotel
2801 N. Hollywood Way
Expected Construction Date: TBD

A six-story hotel on a 69,696 square foot lot. The area of the proposed hotel is 80,183 square feet, and it will include 150 guest rooms, along with a ground level bar, fitness center, and meeting rooms. This project was approved on February 11, 2021.

ALOFT and Residence Inn Hotel
2500 N. Hollywood Way
Status: TBD

A proposed seven (7) story dual-brand hotel that would be operated by Aloft Hotels and Residence Inn. The hotel will consist of 420 hotel rooms – 219 hotel rooms operated by Aloft and 201 hotel rooms operated by Residence Inn.

LaTerra SELECT
777 Front St (Zero Site)
Status: Approved by City Council 2019
Estimated Completion Date: 2023-2025

A mixed-use project with 573 residential (rental) units, a hotel with 307 rooms, and 1,067 sq. ft. of ground floor retail space on a vacant 7-acre site. The residential portion is proposed to be an 8-story podium building with one level of underground parking; hotel will be a 7-story building.

3700 Riverside Drive Mixed Use Project
3700 Riverside Drive
Status: Under Review
Estimated Completion Date: TBD

A mixed-use development project consisting of condominium units, restaurant/retail use, pocket park, and parking.

Warner Bros. Second Century Project
West Olive Ave.
Status: Under Construction
Estimated Completion Date: 2023

The 800,000-square-foot office building complex will consist of a seven-story building of approximately 355,000 square feet and a nine-story building of approximately 445,000 square feet. Reflecting Warner Bros.’ commitment to sustainability and environmental responsibility, the buildings will be built to LEED Certification standards. In recognition of Warner Bros.’ 100th anniversary in 2023, the design and construction phases will be called the Second Century Project. Click here for more info.

Providence Saint Joseph ER and Urgent Care Project
501 S Buena Vista Street
Status: Under Construction
Estimated Completion Date: Summer 2022

A new proposed one-story, 34,500 square foot (44 bed) Emergency Department (ER) and one-story, 8,500 square foot (12 bed) Urgent Care.

Madison Square Garden Media Services Facility
3401 Empire Ave
Status: Under Construction
Estimated Completion: 2022

The Project is a prototype facility for Madison Square Garden (MSG) Entertainment’s creative teams to develop and edit content prior to its ultimate use in Las Vegas productions.

Airport Replacement Terminal
2627 N. Hollywood Way Burbank CA 91505
Status: 2024 - Replacement Terminal opens. Demolition of existing terminal completed within 12 months of replacement terminal operations.

A new 14-gate, 355,000-square-foot replacement terminal to be built with up to 6,637 parking spaces.